Machine Modifications
Modifications and retrofits that add automation, safety, new controls or new products to machines you already run.
- 3Applications
- 3Related products


At a glance
- Machines
- Confirmed in your quote
- Downtime
- Confirmed in your quote
- Support
- Confirmed in your quote
These figures are set for each project from your part, cycle time and line. Send your requirement and we confirm them in the quote.
About this product
Upgrade the machines you already run.
Replacing a machine is not always necessary. Many machines that are mechanically sound can be made faster, safer and easier to run by changing their controls, adding automation or adapting them to new parts.
We modify and retrofit machines you already run: new PLC and HMI controls in place of old relay logic, added sensors and automatic loading, guarding and light curtains, drives for speed control, and tooling changes for new products.
A modified machine is a changed machine, so its risks are assessed again after the work. Changes are planned around your production and fitted in agreed shutdown windows to keep downtime short.
What’s included
- Machine survey and modification plan
- New controls, wiring and HMI
- Added sensors, actuators or tooling
- Safety devices and guarding
- Testing and updated risk assessment
- Updated drawings, programs and training
Key features
What makes it work on your line.
- 01
Control upgrades
Old relay logic or obsolete PLCs are replaced with current PLC and HMI controls.
- 02
Safety upgrades
Guarding, interlocks, light curtains and emergency stops are added where the risk assessment calls for them.
- 03
Added automation
Sensors, actuators and automatic loading take manual steps out of the cycle.
- 04
New products
Tooling, fixtures and settings are changed so the machine can run new parts.
- 05
Machine data
Counts, states and alarms are made available to SCADA or reports, even on older machines.
- 06
Planned downtime
Work is prepared off-site and fitted in agreed shutdown windows.
How we deliver it
From first study to a running line.
- 01
Survey the machine
We inspect the machine, its controls and drawings and agree what needs to change.
- 02
Plan the change
Design, parts and the installation plan are prepared, including the shutdown window.
- 03
Modify & test
The changes are fitted, the machine is tested and the risk assessment is updated.
- 04
Hand over
Updated drawings and programs are handed over and operators are trained on the changes.
Related products
Plan your next line with us.
FAQ
Questions about this product
If the machine is mechanically sound, modifying it is often quicker and costs less. We survey it first and tell you plainly when replacement makes more sense.
Blog
Guides from our engineers.
Practical reading on robot cells, vision inspection, conveyors, machine safety and automating the lines you already run.
Machine safetyMachine Safety Basics: Guarding, Light Curtains and Interlocks
Every automated station must keep people away from moving parts. Here is how fencing, interlocks, light curtains, scanners and emergency stops work together.Read more
Line automationAutomating an Existing Line Without Starting From Scratch
You do not need a new factory to automate. Here is a step-by-step way to automate the manual steps on a line you already run.Read more
Robotics & machinesRobot Cell or Special Purpose Machine: Which Fits Your Production Line?
Both take repetitive work off your operators, but they solve different problems. Here is how to choose between a robot cell and a machine built for one job.Read more



