Electrical Control Panels
Complete electrical control panels (PLC, MCC, VFD and power distribution panels) designed, wired, tested and installed.
- 2Applications
- 3Related products


At a glance
- Enclosure
- Confirmed in your quote
- Current rating
- Confirmed in your quote
- Drawings
- Confirmed in your quote
These figures are set for each project from your part, cycle time and line. Send your requirement and we confirm them in the quote.
About this product
Complete panels, designed and wired.
An electrical control panel holds everything that powers and controls a machine or line: the incoming supply and its protection, motor starters and drives, the PLC and its I/O, power supplies, relays and the terminals for field wiring.
We design and build complete panels: PLC panels, motor control centre (MCC) panels, VFD panels and power distribution panels. Each panel is built from electrical drawings, with wiring run in ducts, ferrule-marked wires and labelled devices so it can be maintained later.
Panels are tested before dispatch, with wiring checks, insulation and continuity tests and a functional check of the control circuits. On site we install, connect and commission them with the machines they control.
What’s included
- Load list and panel design
- Electrical drawings and bill of materials
- Enclosure, busbars and protection
- Wiring, ferrule marking and labelling
- Workshop testing
- Site installation and commissioning
Key features
What makes it work on your line.
- 01
Designed from drawings
Single-line diagrams, control circuits and panel layouts are drawn before the build starts.
- 02
Correct protection
Breakers, fuses and overloads are selected for the loads and the incoming supply.
- 03
Neat, traceable wiring
Wires run in ducts, every wire end is ferrule-marked and every device is labelled to match the drawings.
- 04
Heat and space planned
Device layout, spare space and ventilation are planned so the panel runs cool and can be extended.
- 05
Door devices
Meters, pilot lights, push buttons, selector switches and HMIs are mounted where operators need them.
- 06
Tested before dispatch
Wiring, insulation and control functions are checked in the workshop before the panel goes to site.
How we deliver it
From first study to a running line.
- 01
Gather loads & signals
We list motors, drives, I/O and supply details, and agree the panel type and enclosure rating.
- 02
Design & draw
Electrical drawings, the bill of materials and the panel layout are prepared and shared for approval.
- 03
Build & test
The panel is assembled, wired and tested against the drawings in the workshop.
- 04
Install & commission
Panels are installed, field cables connected and the system commissioned on site.
Related products
Plan your next line with us.
FAQ
Questions about this product
PLC control panels, MCC panels, VFD panels and power distribution panels, as single panels or complete line-ups.
Blog
Guides from our engineers.
Practical reading on robot cells, vision inspection, conveyors, machine safety and automating the lines you already run.
Robotics & machinesRobot Cell or Special Purpose Machine: Which Fits Your Production Line?
Both take repetitive work off your operators, but they solve different problems. Here is how to choose between a robot cell and a machine built for one job.Read more
Vision & sensingVision Inspection on the Production Line: What a Camera Can Check
From presence checks to reading codes, a vision system checks every part and sends a pass/fail signal to your PLC. Here is what it can do and how to plan one.Read more
Material handlingBelt, Roller or Modular Conveyor: Choosing the Right One for Your Line
Conveyors link every station on a line. The right type depends on what you move, how it needs to queue and how it transfers between stations.Read more



